Project Overview
ALISHAR CONTRACTING executed the construction of a 73-kilometer underground potable water transmission line, with pipeline diameters ranging from 200mm to 500mm.
The scope of work included:
- Installation of ductile iron pipes, valves, and valve chambers
- Trench excavation, backfilling, compaction, dewatering, and re-asphalting
- Removal of excess materials and full surface restoration
Specialized works involved the installation of:
- Washout valve chambers in reinforced concrete
- Butterfly valves and flange connections adaptable to SCADA systems
- Air release valve chambers with reinforced concrete construction, fittings, steps, and protective measures