Scope of the Project
ALISHAR CONTRACTING developed Phase 1 and Phase 3 of the Water Transmission Line from Hali, Yoobah, and Al-Lith Dams to the Al-Shouibah Plant.
-
Phase 1 involved the construction of the Al-Lith Water Treatment Plant (WTP), including clarifier tanks, treated water tanks, gravity filters, and the filter building. And a main transmission pipeline with a diameter of 1,400 mm and a total length of 38 kilometres, along with 55 kilometres of 600 mm diameter pipeline.
-
Phase 3 included the construction of the Hali WTP Expansion:
-
Treated Water Tanks (2 units)
-
Gravity Filters (2 units)
-
Clarifier Tanks (4 units)
And the main water transmission pipeline, approximately 91 kilometres long.
-