Project Overview
ALISHAR CONTRACTING completed the construction, testing, and commissioning of a reinforced concrete water reservoir with a total storage capacity of 30,000 cubic meters. This project was delivered to support the growing demand for water storage and distribution in the West Abha area, enhancing local utility infrastructure and ensuring reliable service.
Deliverables
- Construction of a 30,000 m³ water reservoir designed for long-term durability and efficiency.
- Installation of pumping systems and associated utility facilities.
- Construction of support structures and control systems for operation and monitoring.
- Full site development and grading to support operational access and future maintenance.
Compliance with municipal and utility standards for safety and operational performance.